A planned upgrade of the A14 between Cambridge and Huntingdon will include a 3m wide bike path, providing a route for residents of outlying villages to get into Cambridge by bike.

The £1.5 billion scheme is intended to relieve congestion on a section of dual carriageway of which the Highways Agency says: “Almost 85,000 vehicles use this stretch of the A14 every day; significantly more than the level originally designed for. Around quarter of this is heavy goods vehicles – well above the national average for this type of road.” As a result, the road becomes extremely congested at peak times.

As well as frustrating drivers, the existing A14 dual carriageway is not a road any cyclist in their right mind would choose to use. Campaigners have been pointing out for years that it effectively makes unusable the direct route into Cambridge from villages to the north-west, even though the flat terrain makes the journey easily rideable.

According to Cambridge News’ Chris Havergal, the project to upgrade the A14 will now include a cycle route from Swavesey to Cambridge. The new cycleway is expected to be at least 3m wide and to connect with existing cycle routes on Huntingdon Road.

A Highways Agency spokeswoman said: “The A14 Cambridge to Huntingdon improvement scheme proposals include a non-motorised road user (NMU) route as part of the proposed improvements.

“It is envisaged that it will be of a similar standard to that associated with the guided busway.

“The project team is actively discussing the scheme footprint design with NMU groups and the proposed improvement scheme is currently going through a public consultation. We welcome comments from the local community on the design aspects of the scheme and would include all these comments as feedback to the current consultative exercise.”

Cambridge cyclists will however be hoping that the new route is not too similar to the guided busway bike path. The busway linking Cambridge with St Ives includes a wide, well-surfaced path that tends to be flooded and impassable in winter.

Work will start on the A14 upgrade in 2016 and is planned to be complete in 2020.